candidate screening methods
Â
SoiL Thornton
candidate screening methods
July 13, 2024 – January 31, 2025
1.
186,282 miles per second enabling 24 frames per second revoked, OR, Digital Rights
Management (DRM) mirroring a rapid eye movement (REM) frame, 2024
archival pigment prints framed in 24 parts
each 67 x 42 cm
2.
chromosomal discrepancy bridge, 2024
photochromic lens uv transitional material over stained wood construction fabricated by
Falegnameria D’Oria with urinal screen brackets collaboratively designed and produced by
Jamie Sneider and inox projects C.V.M. srI
137 x 508 x 12
Â
candidate screening methods
13 Jul, 24
31 Jan, 25
SoiL Thornton
Progetto
Via Idomeneo, 72, Lecce
Simon Veres